







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Bathroom Remodeling Across Las Vegas
A typical bathroom remodel in Las Vegas runs $9,000 to $28,000, and the honest number you get before demo day is the number that should show up on the invoice. Bathroom remodeling in Las Vegas means working with 1990s stucco-on-frame tract homes, caliche under the slab, and summer heat that punishes any concrete poured at the wrong hour. We’ve scoped these jobs across the valley, from 89108 to 89149, and we know what to check before the first tile comes up. Call (844) 761-9837 and we’ll put a written price in front of you – estimates are free and there’s no pressure to sign anything.
Why Penhallow Remodeling Paradise Is Las Vegas’s Preferred Bathroom Remodeling Company

We’re not the biggest name in the valley, but we’re the one that answers. Our line is covered 24/7 by a real person, not a voicemail prompt, and every homeowner gets a written price before any work starts – not a range floated at the door that grows legs after demo.
Every project carries the 365-Day Done Right Promise, backed in writing: if the work fails inside the guarantee period, we come back and fix it at no charge, and there’s a free return visit if a repair doesn’t hold. Our technicians are background-checked and arrive in uniform, so you know exactly who’s walking into your home. They bring up to 22 years of experience to the work, and they’ve seen what caliche and clay soil do to a subfloor here. That matters more in Las Vegas than it does most places.
We’re part of the Kingswell family of companies, operating to The Kingswell Way since 2004 – say the price before the work, show up in the window we gave, leave the place cleaner than we found it. Each location is independently owned and operated. When you’re pricing a bathroom in Las Vegas, the estimate should be the easy part of the job. Call (844) 761-9837 and let’s get that part done.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Tub to Shower Conversion in Las Vegas
Tub to Shower Conversion in Las Vegas usually runs $3,500 to $10,000, and it’s the upgrade we get asked about most across the older tract subdivisions in 89108, 89128 and 89130. The work means pulling the tub, reframing the alcove, checking the drain rough-in, setting a water-resistant cement board substrate (the moisture-resistant layer behind the tile) and finishing with a pan and tile or a prefabricated receptor. Where the existing drain sits over a caliche-hardened slab, relocating it becomes a jackhammer job, and that’s the one variable that can push a simple conversion toward the top of the range. If your tub is the original from a 1990s build and it’s never been updated, the floor under it may have shifted too. Call (844) 761-9837 for a free estimate.
Checking the Drain Rough-In First
Before we quote a conversion, we look at where the drain sits and what’s under it. A drain that stays put saves you the cost of breaking concrete. A drain that needs to move changes the scope, and you should hear that number on paper, not after the crew has the demo hammer out.
Tile Pan Versus Prefab Receptor
A tiled shower pan gives you more freedom in shape and slip-resistant finish, which matters in a house where the floor takes a lot of foot traffic. A prefabricated receptor is faster to set and easier to keep clean at the seams. We’ll price both so you can see the trade-off in dollars rather than a vague description. We install Kohler and Moen fixtures on these jobs, so the hardware behind the waterproofing is a known quantity.
One Day Bath Remodel in Las Vegas

One Day Bath Remodel in Las Vegas starts at $5,000 to $12,000 for the compact bathrooms common in the valley’s smaller tract plans, and the name doesn’t mean the whole project takes a day. It means we stage the work so that demo, prep and the visible finish happen in a tight sequence with a scheduled arrival window, keeping the mess to a minimum and your other bathroom usable. Before the finish goes in, we check the subfloor for cracks and moisture. Clay soils and caliche mean the floor has been moving under that old tile for years, and skipping that check is how a fresh-looking bathroom fails two winters later. Call (844) 761-9837 to schedule your free estimate.
What Stays and What Goes
Most of these jobs keep the existing layout and update the surfaces – vanity, tile, fixtures, lighting. Keeping the plumbing where it is keeps the price down. Moving the toilet or shower to chase a new layout is what turns a contained project into a bigger one, and we’d rather tell you that before you commit.
Why the Sequence Matters in Summer
Las Vegas summers push surface temperatures on concrete and stucco past 140°F, which means any pour or patch cures too fast and fails. We schedule that work around the heat, whether that’s an early pour or a curing compound. It’s the difference between a floor that lasts and one that cracks by fall.
Trusted Brands We Service in Las Vegas
We work with materials from brands you already trust, installed to the standard those brands expect: KraftMaid and Wellborn cabinetry, Cambria, Silestone and Caesarstone countertops, Kohler, Moen and Delta fixtures, Toto and Grohe for the details you touch every day. We don’t claim to stock parts on a truck or keep a warehouse of inventory, and we won’t pretend otherwise. What we do is source the right product for your job and get it moving to your Las Vegas address on a schedule we can plan around. That means the vanity you pick in the showroom is the vanity that gets set into your bathroom, not a similar-looking substitute that shows up on install day.
See the difference
Before
After
Before
After
Before
AfterCommon Bathroom Remodeling Problems We See in Las Vegas Homes
- Hidden subfloor cracks from soil movement. Expansive clay swells after a wet winter and shrinks through a dry summer, and the floor frame under an old bathroom often shows hairline cracking you can’t see through the tile. We check it before anything gets set, because tile laid over a moving floor fails.
- Stucco and concrete scheduled in peak heat. Summer highs over 105°F will wreck an on-time pour or a fresh stucco patch if it isn’t shaded and cured properly. The visible result is delamination and cracking that shows up months later, and it has nothing to do with the product.
- Caliche under the slab. The valley’s calcium-carbonate hardpan sits close to the surface across much of Las Vegas, and it turns a simple drain relocation into a jackhammer job and a re-pour. That’s the most common reason a rough-in change overruns its budget, and it’s why we scope plumbing moves before we quote them.
- Aging mid-1990s originals. The 89129, 89130, 89131 and 89149 ZIPs are full of stucco-on-frame tract homes from the boom decades, and the original bathroom assemblies are hitting end of life. Original vanities, tile and fixtures are wearing out at the same time, and a piecemeal fix often costs more than doing the whole room once.
Pricing for Bathroom Remodeling in Las Vegas, NV
Here’s what a bathroom project in Las Vegas actually costs, broken out by scope. These are market ranges, not teaser numbers, and the written price you get holds through completion – if the scope doesn’t change, the number doesn’t change. Call (844) 761-9837 for a free estimate and a written quote before you commit to anything.
| Job | Typical Las Vegas Range |
|---|---|
| Bathroom Remodel | $9,000 – $28,000 |
| Small Bathroom Remodel | $5,000 – $12,000 |
| Walk-In Shower Installation | $4,500 – $12,000 |
| Tub-to-Shower Conversion | $3,500 – $10,000 |
| Shower Replacement | $3,000 – $8,500 |
| Bathroom Vanity Installation | $800 – $3,000 |
What moves you within a range: whether the plumbing stays where it is, whether the subfloor needs repair, the tile you choose, and whether caliche sits under a drain you want to move. Those four items account for most of the variance on a Las Vegas job.
We Also Serve Cities Near Las Vegas
We work with homeowners in Las Vegas and the surrounding valley, and bathroom remodeling in Winchester, North Las Vegas, Sunrise Manor and Paradise is scoped and priced the same way as any Las Vegas job. Call (844) 761-9837 to schedule a free estimate at your address.
Serving Las Vegas, NV – Our Local Coverage Area
We serve Las Vegas and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs About Bathroom Remodeling in Las Vegas
Yes for anything structural or plumbing-related – moving a drain, relocating fixtures, altering framing, or adding a new electrical circuit. A finish-only refresh (paint, fixtures, a vanity swap in the same location) often doesn’t require one. Permits get pulled and the work gets inspected, and we’ll tell you up front which category your job falls into. Call (844) 761-9837 for an exact answer on your scope – estimates are free.
A standard full bathroom remodel runs about three to five weeks; a small or one-day staged remodel finishes faster, often within a week or two of the scheduled start. The two things that stretch the calendar here are a subfloor repair discovered after demo and any concrete work around caliche. We give you a real calendar at the estimate, and when something changes, you hear it from us the same day. Call (844) 761-9837 to talk through your timeline.
Caliche is a calcium-carbonate hardpan that sits close to the surface across much of the Las Vegas valley, and when it’s in the way of a drain or footing, it has to be broken out with a jackhammer rather than dug by hand. That’s the single most common driver of change orders on rough-in work here. We probe the scope before we quote so you hear about it before the demo crew arrives, not after. Call (844) 761-9837 and we’ll walk your specific job before quoting a number.
Sometimes with a prefabricated receptor on a straight alcove swap, yes – but not always, and we won’t promise it before we’ve seen what’s under the tub. If the drain stays put and the subfloor is sound, the finish stages can compress to one day. If the drain moves or the subfloor needs repair, it takes longer, and that’s the honest answer. Call (844) 761-9837 for a free estimate and we’ll tell you which one yours is.
Most tile cracking in Las Vegas homes traces back to soil movement – expansive clay reacting to wet winters and dry summers – combined with a subfloor that wasn’t checked before the tile went down. Extreme heat and caliche both add stress on top of that. Tile doesn’t fail on its own; it fails when what’s under it moves. Call (844) 761-9837 to schedule a free assessment and written quote for repair or replacement.
Written by the team at Penhallow Remodeling Paradise.











